New six-story precast parking garage with 671 parking spaces will be constructed on the northwest side of the existing HCA Florida West campus where a surface parking lot is currently located. The site construction will entail demolition of existing parking areas and construction of new concrete curbs, sidewalks, asphalt paving, utilities, and landscaping. The garage will be precast and include two passenger elevators and two stair towers.
Brasfield & Gorrie is committed to increasing our collaboration with small and diverse firms, and believe that every project is an opportunity to champion diversity and inclusion. Learn more about our efforts and supplier diversity program here. We want to make sure you receive an invitation to bid for this project by creating or updating your profile in Building Connected. You can access Building Connected instructions by visiting https://www.brasfieldgorrie.com/ trade-partners/ Bid invitations will be sent out via Building Connected.
• Professional Surveying • Site Services • Equipment Rental • Construction Fencing • Waste Management • Final Cleaning • Temporary Labor • Turn Key Concrete Contractors • Precast Structural Concrete • Masonry • Misc. Metals • Waterproofing / Sealant • Modified Bit Roofing • Doors, Frames & Hardware • Glass & Glazing • Metal Studs & Drywall • Ceramic, Porcelain & Tile • Acoustical Ceilings • Resilient Flooring • Painting • General Specialties • Fabricated Signage • Metal Canopies & Covers • Parking Control Equipment • Elevators • Fire Suppression • Plumbing • Test & Balance Services • HVAC Systems • Electrical • Structured Cabling • Access Control Systems • Site Grading & Utilities • Auger Cast Piles • Asphalt Paving • Site Concrete • Landscaping & Irrigation
Click here to register.
A meeting link will be provided via email.
Need to attend virtually? Click here.